{{ variable.name }}
Fully automated coating line designed for wheel hubs and alloy wheels. Utilizes robotic painting to achieve uniform coverage on complex geometries. Production cycle of 45 seconds per rack ensures throughput of 1,760 racks daily. Operates 22 hours/day for 336 days/year.
| Item | Specification |
|---|---|
| Part Types | Wheel hubs, wheel hub caps, alloy wheels |
| Part Material | ABS+PC (typical for hub caps) |
| Working Days | 336 days/year |
| Daily Operating Hours | 22 hours/day |
| Spray Booth Temperature | 25±2°C |
| Spray Booth Humidity | 65±10% RH |
| Painting Method | Robotic + autonomous |
| Production Cycle | 45 s/rack (1,760 racks/day) |
| Max Rack Size | D1350×W900×H200 mm |
| Equipment Utilization | 85% |
Available in configurations for wheel hubs, caps, and alloy wheels. Can include flame treatment booth for pre-paint surface preparation.
Carbon steel main frame, stainless steel spray booth and piping. Compatible with high-temperature curing ovens.
Ideal for automotive wheel manufacturers and tier-1 suppliers needing high-quality, high-volume coating.
Our parent company has delivered 20 complete automated coating lines to automotive plants worldwide, achieving 98% first-pass yield and 25% paint reduction.
Yes, the rack system accommodates parts up to 1350mm long, 900mm wide, and 200mm high.
With a 45-second cycle, the line produces up to 1,760 racks per day.
Robotic painting allows quick color changes with minimal changeover time.
The line includes VOC treatment and can be designed to meet ISO14001 standards.
MOQ is 2 units. Payment terms are 50% T/T within 7 days after contract, 40% before shipment, 10% after installation.
We offer pre-export testing and on-site installation guidance as part of our service.
Warranty details are available upon request.
Contact us for a tailored quote: attractivechina@gmail.com | Tel/WhatsApp: +86 135-8061-6025

wheel hub cap coating line.jpg - 6000x4000

alloy wheel coating line (4).jpg - 4000x2256